This is a message from the Estates Infrastructure and Compliance Team: Following the recent heavy rainfall, our internal maintenance teams are currently dealing with a high number of leaks and water ingress related issues across the whole estate. I would like to ask for patience in regards to any non-essential work requests that have been … Continue reading Message from Estates – Heavy rainfall
Space Management at Sheffield Hallam: Microbiology Lab
The micro-biology lab on Owen Level 12 was recently given a light refresh of the areas that make up the facility. The main lab and adjoining rooms have been reconfigured, and we have altered the layout to improve workflows which in turn will allow students to carry out their work more efficiently. All the rooms … Continue reading Space Management at Sheffield Hallam: Microbiology Lab
Space Management at Sheffield Hallam: Sensory Evaluation Suite
In August, the Sensory Evaluation Suite was transformed into a new and improved hub for departmental staff and students. Modern LED lighting has been installed across all of the rooms, and most importantly to the tasting booths which is a key space in the evaluation process, along with new flooring in the meeting room, new … Continue reading Space Management at Sheffield Hallam: Sensory Evaluation Suite
A new look for Cantor Building
Over the summer, we refurbished several areas within Cantor building to create a more flexible, comfortable and social environment for students and staff. The refresh included improving lighting in the main lobby area, new flooring in the café space and innovative furniture to provide versatile social spaces and collaboration booths. Selected teaching rooms have been … Continue reading A new look for Cantor Building
111 Charles Street – Replacement radiator valves
On Monday 11th November, British Gas will be replacing the radiator valves in 111 Charles Street (adjoining Church House) on the first floor. There should be very little impact to occupants other than the heating being off for most of the day. If you have any queries about this work, please contact Amanda Hughes on … Continue reading 111 Charles Street – Replacement radiator valves
Multi-faith Centre Transformation
As part of our commitment to the wellbeing of our students and staff, the University's Multi-faith centre has recently been transformed into a welcoming, safe space for everyone on campus to enjoy regardless of beliefs. The refurbishment was the culmination of collaborative work between students, Chaplaincy, student services and Estates; creating a place for prayer, mediation and reflection. … Continue reading Multi-faith Centre Transformation
Road resurfacing – Arundel Gate, Pinstone Street and Eyre Street
As part of the Streets Ahead highway work, sections of Arundel Gate, Pinstone Street and Eyre Street will be resurfaced in early November. This work is due to last for approximately 5 nights between the hours of 8pm-5am Monday to Friday only. The work will be completed under a road closure and there will be … Continue reading Road resurfacing – Arundel Gate, Pinstone Street and Eyre Street
The National Centre of Excellence for Food Engineering launch
On Friday, our new National Centre of Excellence for Food Engineering (NCEFE) was opened with leading figures from the industry and elected Mayor, Dan Jarvis MP. This is a cutting-edge facility set to improve food engineering processes, address the sector skills gap and boost the competitiveness of the UK's largest manufacturing sector. It also makes … Continue reading The National Centre of Excellence for Food Engineering launch
Architecture has opened the doors to two refurbished studios
The Architecture Department has recently opened the doors to two refurbished studios on Surrey level 3. The project was led by Faculty Accommodation Manger, Carolyne Ryder and Estates Project Manager, John McNamara, who have worked over the summer to bring rooms 5306 and 5310 up to the same specification as those completed previously. Room 5306 … Continue reading Architecture has opened the doors to two refurbished studios
Fire door replacements – Owen Building
As part of our continual maintenance and improvement of the estate, we will be replacing a number of fire doors located on the North stairwell of Owen Building. This work is planned to take place from Monday 11th November to early December 2019. If you have any queries, please contact Chris Dales by email c.dales@shu.ac.uk … Continue reading Fire door replacements – Owen Building