Planned refurbishment Floor 11, Owen Building : Monday 14 January 2019 – Tuesday 5 March 2019

Part of the refurbishment works involves the upgrading of ceiling lighting throughout the floor. This is a roll out programme, with floor eleven being the first to be upgraded. This upgrade will run in conjunction with the refurbishment. Each room on floor eleven will be affected by this upgrade. The contractors, NRC Services Limited will … Continue reading Planned refurbishment Floor 11, Owen Building : Monday 14 January 2019 – Tuesday 5 March 2019

Essential maintenance to the University’s high voltage network during Christmas closure period (27 December)

Power will be isolated to ALL AREAS of the following buildings during the Christmas closure period on Thursday 27 December for the approximate times (Adsetts 8.00am - 10.00am) Eric Mensforth 8.00am - 1.00pm) (Owen 9.30am - 11.30am) (Norfolk 10.30am - 12.30pm) (Cantor 11.30am - 1.00pm). We're sorry for any inconvenience caused during this time. Any … Continue reading Essential maintenance to the University’s high voltage network during Christmas closure period (27 December)

Electrical fixed wire inspection and testing to Main Building and Herbert Wing of Collegiate Crescent (10 December – 4 January)

The work will involve interruptions to the power supply (Monday 10th December 2018 6.00am - Friday 4th January 2019 5.00pm) which colleagues aim to keep to the absolute minimum. No interruptions will be carried out without prior arrangement and the contractor will be asked to carry out some tests out of normal working hours if … Continue reading Electrical fixed wire inspection and testing to Main Building and Herbert Wing of Collegiate Crescent (10 December – 4 January)