New lift system in Owen Building

As part of the University’s commitment to creating a sustainable estate, the two-year project to refurbish the main lifts in the Owen Building has now come to an end.  The new lifts will provide reliable, quicker journeys and will reduce our carbon footprint by saving around 40% more energy than standard lifts.

A new ‘Hall Call’ console system is now in place which will assign each user a lift based on the floor they select to reduce waiting times.  You enter your required floor destination on the console outside, and the system works out the nearest and quickest lift to take you to your floor.

Partially sighted and blind people can press an audio button which will provide verbal instruction and confirmation. To assist wheelchair users, longer door opening times have been introduced to allow extra time to access the lifts.

No destination selection is possible from within the lift.  If you get in a lift and haven’t pressed the button outside the solution is to get out at the next available floor, select your destination on the console outside the lift then wait for your assigned lift.

Additional guidance on how to use the new system will be available – look out for posters and flyers and visit the Future Spaces blog for more information: https://blogs.shu.ac.uk/futurespaces/