We are currently experiencing heating and hot water issues in many buildings around City Campus due to an unforeseen district heating power failure. We are working with our supplier to restore power as soon as possible. If you have any queries, please contact Danny Crowther on ext. 4826.
Stoddart car park – update
As part of the shutter installation project, the fire detection within Stoddart Car Park will be upgraded throughout the car park area – and sections will need to be closed off for the work to proceed. While each phase is progressing the remaining areas will still be accessible, with general car parking and disabled car … Continue reading Stoddart car park – update
Knowledge Gateway improvement works
Pond Street between Flat Street and Surrey Lane, including the Harmer Lane junction will be fully closed from: 8pm on Friday 31 January to 05:30am on Monday 3 February 8pm on Friday 7 February to 05:30am on Monday 10 February 8pm on Friday 14 February to 05:30am on Monday 17 February This will be to … Continue reading Knowledge Gateway improvement works
Aspect Court – Heating system
The heating system serving level 5 and 6 of Aspect court is not in operation due to a critical failure in the heating plant. Estates and Facilities are currently working on a project to replace the affected system, but is likely that this will take 2-3 months due to the size and complexity of the … Continue reading Aspect Court – Heating system
Stoddart car park – Update
The works at Stoddart Car Park will not be complete today as previously planned. The entrance roller shutter is now in place, but there has been an issue with the manufacturer for the exit gate, which means we will be boarding the exit to prevent any unauthorised access over the Christmas break. To enable this … Continue reading Stoddart car park – Update
Planned Network Maintenance for Arundel Distribution
On Monday 23 December between 8am and 8:30am the following service impacting Network Maintenance will be performed by the network team. The work will result in a 10-15 minute service outage of the network which will impact Wired and Wireless IT Services. This work on the Arundel Distribution will impact on the following Buildings: Arundel Charles … Continue reading Planned Network Maintenance for Arundel Distribution
Planned power outages during December and January for high voltage testing
During December and January, there will be some High Voltage maintenance and testing which requires power to be shut down for buildings across campus on some Friday and Saturday nights (see the schedule below). As a result of the power outages, there could be some disruption as colleagues return to work. If you discover any … Continue reading Planned power outages during December and January for high voltage testing
Stoddart car park – Improving security
Work has just begun on the installation of a roller shutter door and gate to Stoddart car park entrances and exits, and a new pedestrian entrance way. When completed (expected to be the end of January), the vehicle doors and gates will be activated via Automatic Number Plate Recognition (ANPR), and the pedestrian door will … Continue reading Stoddart car park – Improving security
Collegiate Hall – Heating
We apologise that disruption has occurred to the heating system at Collegiate Hall. We are working to rectify the problem immediately and hope to have the heating restored before 12 noon. Sorry for any inconvenience caused. If you have any questions, please contact Nathan Bakewell on ext 6773.
Aspect Court – Improving accessibility
From Friday 22nd - Monday 25th of November, we will be replacing the existing rear door in Aspect Court with a new accessible door. This work will comply with the Equality and Diversity Act; making the building more accessible to all. If you have any questions about this work, please contact Samantha Bowskill on ext. … Continue reading Aspect Court – Improving accessibility