As part of the Estates long term maintenance plan we are upgrading the existing electrical distribution within the Main Building at Collegiate Campus.
Following on from the initial shut down we carried out on 8 June, a further power shutdown has been agreed upon in order to complete the initial works.
On Saturday 13 July from 6am until 8pm Sunday 14 July, the following areas or buildings will be without power for the duration of the shutdown.
• Main Hall
• Pearson
• 48 Collegiate Crescent (Gate House)
• Collegiate Library (As an alternative, the Adsetts Library will be open as usual)
• Main Building Boiler house
Please bear in mind that due to the power shut-down any perishable items located in the fridges will need to be cleared out before the evening of Friday 12 July so not to pose a hazard.
Thank you for your cooperation.
If you have any queries, please contact the Estates Project Manager; Corinne Matthews on c.matthews@shu.ac.uk
If you would like to report a fault or maintenance issue, you can contact the Facilities Directorate Help Desk on 0114 225 4444 (Ext 4444), Monday to Friday 8am until 5pm.