It feels a bit like Christmas ….
We are entering the finishing straight of the first phase of the project, coinciding with the end of the financial year.
A successful MEng group project has designed the components for the flow circuit, which are being prepared for manufacture, and a lot of parcels and crates are arriving.
The Instron load frame has arrived in the lab and is awaiting commissioning, and the safety enclosure that will house the class 4 laser system for the Particle Image Velocimetry is being manufactured at Boldman, awaiting fitting of the wall panels – on seing that photo, we had to double check the drawings and take a tape measure to the room …. it will fit.
We’ll keep you updated on the process …..