{"id":2638,"date":"2018-10-17T09:59:48","date_gmt":"2018-10-17T09:59:48","guid":{"rendered":"https:\/\/blogs.shu.ac.uk\/hwbstaffnews\/?p=2638"},"modified":"2018-10-24T10:05:59","modified_gmt":"2018-10-24T10:05:59","slug":"essential-construction-works-to-the-robert-winston-building","status":"publish","type":"post","link":"https:\/\/blogs.shu.ac.uk\/hwbstaffnews\/2018\/10\/17\/essential-construction-works-to-the-robert-winston-building\/","title":{"rendered":"Essential construction works to the Robert Winston Building"},"content":{"rendered":"<p><b><i><span style=\"color: #000000;font-family: Calibri;font-size: medium\">Nathan Bakewell, Project Manager in Estates <\/span><\/i><\/b><\/p>\n<p>The Estates department will be undertaking essential construction works to the Robert Winston Building from October 2018 \u2013 April 2019. Works will commence from 11<sup>th<\/sup> October.<\/p>\n<p>The works include the installation of a new plantroom and gas supply, to independently supply the Robert Winston Building. The current heating supply is fed from the adjacent Woodville buildings. Through undertaking these works, we will be able to;<\/p>\n<ul>\n<li>address long term maintenance issues ensuring the heating system is fully functional when required<\/li>\n<li>operate the RWB heating on its own independent system<\/li>\n<li>modernise the heating system to reduce life cycle costs<\/li>\n<li>provide increased efficiency which will have a positive effect on our goals towards a sustainable University<\/li>\n<\/ul>\n<p>The new plantroom will be located in the rear under croft area. During the period of construction, parking in this area will temporarily restricted due to the works. The two accessible spaces will be maintained during the duration of the works, and can be accessed via Victoria Road. Upon completion, parking will be re-instated to this area. The secure cycle parking will remain in operation for the first two weeks, and then alternative temporary cycle parking will be provided for the remainder of the works duration. Access through the site, down the slip road, from Broomhall Road to Victoria Road will be restricted to essential deliveries and services.<\/p>\n<p>Staff and students will notice some disruption during this period. Any disruption will be carefully co-ordinated to minimise any impact on the building. However our contractors are fully aware that they will be operating within a busy environment, and will be accommodating to staff and student needs should any particular issues arise. The Contractors undertaking the works are NRC Services.<\/p>\n<p>Thank you for your patience and understanding while this work is taking place, we will aim to keep disruption to a minimum.<\/p>\n<p>We will provide regular updates, in the meantime if you have any worries or concerns please direct them to the building facilities team or directly to Nathan Bakewell, SHU Project Manger &#8211; 07500 227 892.<\/p>\n<p>&nbsp;<\/p>\n","protected":false},"excerpt":{"rendered":"<p>Nathan Bakewell, Project Manager in Estates The Estates department will be undertaking essential construction works to the Robert Winston Building from October 2018 \u2013 April 2019. Works will commence from&hellip;<\/p>\n","protected":false},"author":2258,"featured_media":2640,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"_jetpack_memberships_contains_paid_content":false,"wds_primary_category":0,"footnotes":"","jetpack_publicize_message":"Essential construction works to the Robert Winston Building","jetpack_publicize_feature_enabled":true,"jetpack_social_post_already_shared":true,"jetpack_social_options":{"image_generator_settings":{"template":"highway","default_image_id":0,"font":"","enabled":false},"version":2}},"categories":[27],"tags":[648,721,576],"class_list":["post-2638","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-building-and-estate-updates","tag-estates","tag-robert-winston-building","tag-staff-news"],"jetpack_publicize_connections":[],"jetpack_featured_media_url":"https:\/\/i0.wp.com\/blogs.shu.ac.uk\/hwbstaffnews\/files\/2018\/10\/Essential-construction-works-RWB-gallery.jpg?fit=1028%2C624&ssl=1","jetpack_sharing_enabled":true,"jetpack_shortlink":"https:\/\/wp.me\/p8KEAX-Gy","jetpack-related-posts":[{"id":3832,"url":"https:\/\/blogs.shu.ac.uk\/hwbstaffnews\/2019\/09\/06\/major-plantroom-refurbishments\/","url_meta":{"origin":2638,"position":0},"title":"Major plantroom refurbishments","author":"Mark Greene","date":"September 6, 2019","format":false,"excerpt":"This summer, we have been undertaking major plantroom refurbishments to the following buildings: \u00a0Arundel Gate Court \u00a0Stoddart \u00a0Harmer \u00a0Eric Mensforth Sheaf Collegiate Hall Pearson These works have been undertaken to provide a more efficient heating system within these buildings. Through undertaking these works, we will be able to: address long-term\u2026","rel":"","context":"In &quot;Building and Estate Updates&quot;","block_context":{"text":"Building and Estate Updates","link":"https:\/\/blogs.shu.ac.uk\/hwbstaffnews\/category\/building-and-estate-updates\/"},"img":{"alt_text":"","src":"https:\/\/i0.wp.com\/blogs.shu.ac.uk\/hwbstaffnews\/files\/2019\/09\/Major-plantroom-refurbishments.jpg?fit=1028%2C624&ssl=1&resize=350%2C200","width":350,"height":200,"srcset":"https:\/\/i0.wp.com\/blogs.shu.ac.uk\/hwbstaffnews\/files\/2019\/09\/Major-plantroom-refurbishments.jpg?fit=1028%2C624&ssl=1&resize=350%2C200 1x, https:\/\/i0.wp.com\/blogs.shu.ac.uk\/hwbstaffnews\/files\/2019\/09\/Major-plantroom-refurbishments.jpg?fit=1028%2C624&ssl=1&resize=525%2C300 1.5x, https:\/\/i0.wp.com\/blogs.shu.ac.uk\/hwbstaffnews\/files\/2019\/09\/Major-plantroom-refurbishments.jpg?fit=1028%2C624&ssl=1&resize=700%2C400 2x"},"classes":[]},{"id":510,"url":"https:\/\/blogs.shu.ac.uk\/hwbstaffnews\/2017\/07\/21\/unified-comms-system-in-robert-winston-building\/","url_meta":{"origin":2638,"position":1},"title":"Unified Comms System in Robert Winston Building","author":"Jane Gardner-Florence","date":"July 21, 2017","format":false,"excerpt":"From Wednesday 2nd to Friday 4th August 2017 those working in Robert Winston Building will move from the existing telephone service over to the new Unified Comms system. Unified Comms or UC is the system that is replacing our aging phone system. It provides modern methods of communication yet is\u2026","rel":"","context":"In &quot;Building and Estate Updates&quot;","block_context":{"text":"Building and Estate Updates","link":"https:\/\/blogs.shu.ac.uk\/hwbstaffnews\/category\/building-and-estate-updates\/"},"img":{"alt_text":"","src":"https:\/\/i0.wp.com\/blogs.shu.ac.uk\/hwbstaffnews\/files\/2017\/07\/UCS.jpeg?fit=1200%2C678&ssl=1&resize=350%2C200","width":350,"height":200,"srcset":"https:\/\/i0.wp.com\/blogs.shu.ac.uk\/hwbstaffnews\/files\/2017\/07\/UCS.jpeg?fit=1200%2C678&ssl=1&resize=350%2C200 1x, https:\/\/i0.wp.com\/blogs.shu.ac.uk\/hwbstaffnews\/files\/2017\/07\/UCS.jpeg?fit=1200%2C678&ssl=1&resize=525%2C300 1.5x, https:\/\/i0.wp.com\/blogs.shu.ac.uk\/hwbstaffnews\/files\/2017\/07\/UCS.jpeg?fit=1200%2C678&ssl=1&resize=700%2C400 2x, https:\/\/i0.wp.com\/blogs.shu.ac.uk\/hwbstaffnews\/files\/2017\/07\/UCS.jpeg?fit=1200%2C678&ssl=1&resize=1050%2C600 3x"},"classes":[]},{"id":4277,"url":"https:\/\/blogs.shu.ac.uk\/hwbstaffnews\/2019\/11\/21\/collegiate-hall-heating-system\/","url_meta":{"origin":2638,"position":2},"title":"Collegiate Hall \u2013 heating system","author":"Mark Greene","date":"November 21, 2019","format":false,"excerpt":"Estates will be reconnecting the newly refurbished heating system at Collegiate Hall on the weekend of 23\u00a0November. This process will switch over from the temporary heating supply currently in operation. We anticipate that there may be intermittent interruption of the heating and hot water services on Monday 25th November during\u2026","rel":"","context":"In &quot;Building and Estate Updates&quot;","block_context":{"text":"Building and Estate Updates","link":"https:\/\/blogs.shu.ac.uk\/hwbstaffnews\/category\/building-and-estate-updates\/"},"img":{"alt_text":"","src":"https:\/\/i0.wp.com\/blogs.shu.ac.uk\/hwbstaffnews\/files\/2019\/11\/Collegiate-hall-works.jpg?fit=1028%2C624&ssl=1&resize=350%2C200","width":350,"height":200,"srcset":"https:\/\/i0.wp.com\/blogs.shu.ac.uk\/hwbstaffnews\/files\/2019\/11\/Collegiate-hall-works.jpg?fit=1028%2C624&ssl=1&resize=350%2C200 1x, https:\/\/i0.wp.com\/blogs.shu.ac.uk\/hwbstaffnews\/files\/2019\/11\/Collegiate-hall-works.jpg?fit=1028%2C624&ssl=1&resize=525%2C300 1.5x, https:\/\/i0.wp.com\/blogs.shu.ac.uk\/hwbstaffnews\/files\/2019\/11\/Collegiate-hall-works.jpg?fit=1028%2C624&ssl=1&resize=700%2C400 2x"},"classes":[]},{"id":655,"url":"https:\/\/blogs.shu.ac.uk\/hwbstaffnews\/2017\/08\/24\/dts-drop-in\/","url_meta":{"origin":2638,"position":3},"title":"Start of year Digital Technical Services drop-in sessions","author":"Jane Gardner-Florence","date":"August 24, 2017","format":"aside","excerpt":"Digital Technology Services will be holding some Start of Year drop-in sessions.\u00a0 The purpose of these sessions is for teaching staff to be able to highlight issues with classroom readiness for the start of teaching. Please be aware: any faults with existing hardware should be reported to IT Help on\u2026","rel":"","context":"In &quot;Building and Estate Updates&quot;","block_context":{"text":"Building and Estate Updates","link":"https:\/\/blogs.shu.ac.uk\/hwbstaffnews\/category\/building-and-estate-updates\/"},"img":{"alt_text":"","src":"https:\/\/i0.wp.com\/blogs.shu.ac.uk\/hwbstaffnews\/files\/2017\/08\/DTS.jpg?fit=1028%2C768&ssl=1&resize=350%2C200","width":350,"height":200,"srcset":"https:\/\/i0.wp.com\/blogs.shu.ac.uk\/hwbstaffnews\/files\/2017\/08\/DTS.jpg?fit=1028%2C768&ssl=1&resize=350%2C200 1x, https:\/\/i0.wp.com\/blogs.shu.ac.uk\/hwbstaffnews\/files\/2017\/08\/DTS.jpg?fit=1028%2C768&ssl=1&resize=525%2C300 1.5x, https:\/\/i0.wp.com\/blogs.shu.ac.uk\/hwbstaffnews\/files\/2017\/08\/DTS.jpg?fit=1028%2C768&ssl=1&resize=700%2C400 2x"},"classes":[]},{"id":3558,"url":"https:\/\/blogs.shu.ac.uk\/hwbstaffnews\/2019\/06\/26\/transforming-lives-sessions-in-july\/","url_meta":{"origin":2638,"position":4},"title":"Transforming Lives &#8211; sessions in July","author":"Mark Greene","date":"June 26, 2019","format":false,"excerpt":"The sessions give all staff the opportunity to hear updates directly from project leads on\u00a0strategy implementation. There will also be the opportunity to ask any questions you may have. The following sessions are now live and\u00a0tickets can be booked here: Wednesday 17 July (10.30 \u2013 11.30am), Stoddart-7140 (City campus) Please\u2026","rel":"","context":"In &quot;Events&quot;","block_context":{"text":"Events","link":"https:\/\/blogs.shu.ac.uk\/hwbstaffnews\/category\/events\/"},"img":{"alt_text":"","src":"https:\/\/i0.wp.com\/blogs.shu.ac.uk\/hwbstaffnews\/files\/2019\/02\/Transforming-Lives.jpg?fit=600%2C314&ssl=1&resize=350%2C200","width":350,"height":200,"srcset":"https:\/\/i0.wp.com\/blogs.shu.ac.uk\/hwbstaffnews\/files\/2019\/02\/Transforming-Lives.jpg?fit=600%2C314&ssl=1&resize=350%2C200 1x, https:\/\/i0.wp.com\/blogs.shu.ac.uk\/hwbstaffnews\/files\/2019\/02\/Transforming-Lives.jpg?fit=600%2C314&ssl=1&resize=525%2C300 1.5x"},"classes":[]},{"id":3738,"url":"https:\/\/blogs.shu.ac.uk\/hwbstaffnews\/2019\/08\/01\/glazing-works-programme\/","url_meta":{"origin":2638,"position":5},"title":"Glazing works programme","author":"Mark Greene","date":"August 1, 2019","format":false,"excerpt":"The next phase of the cross-campus glazing works project has now begun and is expected to be complete by Thursday 22 August 2019. The work will take place on all levels on the internal doors, windows or side panels and will not cause any disruption to normal daily activities. If\u2026","rel":"","context":"In &quot;Building and Estate Updates&quot;","block_context":{"text":"Building and Estate Updates","link":"https:\/\/blogs.shu.ac.uk\/hwbstaffnews\/category\/building-and-estate-updates\/"},"img":{"alt_text":"","src":"https:\/\/i0.wp.com\/blogs.shu.ac.uk\/hwbstaffnews\/files\/2019\/08\/Glazing-Works-Programme-2.jpg?fit=1028%2C624&ssl=1&resize=350%2C200","width":350,"height":200,"srcset":"https:\/\/i0.wp.com\/blogs.shu.ac.uk\/hwbstaffnews\/files\/2019\/08\/Glazing-Works-Programme-2.jpg?fit=1028%2C624&ssl=1&resize=350%2C200 1x, https:\/\/i0.wp.com\/blogs.shu.ac.uk\/hwbstaffnews\/files\/2019\/08\/Glazing-Works-Programme-2.jpg?fit=1028%2C624&ssl=1&resize=525%2C300 1.5x, https:\/\/i0.wp.com\/blogs.shu.ac.uk\/hwbstaffnews\/files\/2019\/08\/Glazing-Works-Programme-2.jpg?fit=1028%2C624&ssl=1&resize=700%2C400 2x"},"classes":[]}],"jetpack_likes_enabled":true,"_links":{"self":[{"href":"https:\/\/blogs.shu.ac.uk\/hwbstaffnews\/wp-json\/wp\/v2\/posts\/2638","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/blogs.shu.ac.uk\/hwbstaffnews\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/blogs.shu.ac.uk\/hwbstaffnews\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/blogs.shu.ac.uk\/hwbstaffnews\/wp-json\/wp\/v2\/users\/2258"}],"replies":[{"embeddable":true,"href":"https:\/\/blogs.shu.ac.uk\/hwbstaffnews\/wp-json\/wp\/v2\/comments?post=2638"}],"version-history":[{"count":1,"href":"https:\/\/blogs.shu.ac.uk\/hwbstaffnews\/wp-json\/wp\/v2\/posts\/2638\/revisions"}],"predecessor-version":[{"id":2639,"href":"https:\/\/blogs.shu.ac.uk\/hwbstaffnews\/wp-json\/wp\/v2\/posts\/2638\/revisions\/2639"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/blogs.shu.ac.uk\/hwbstaffnews\/wp-json\/wp\/v2\/media\/2640"}],"wp:attachment":[{"href":"https:\/\/blogs.shu.ac.uk\/hwbstaffnews\/wp-json\/wp\/v2\/media?parent=2638"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/blogs.shu.ac.uk\/hwbstaffnews\/wp-json\/wp\/v2\/categories?post=2638"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/blogs.shu.ac.uk\/hwbstaffnews\/wp-json\/wp\/v2\/tags?post=2638"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}